Master Planned Communities: From 200-acre luxury home communities to 25,000-acre developments, Hines provides the professional care, detailed analysis, and cost clarity to develop a world class irrigation system adding extraordinary value to your project.
Here is a small selection of our current Master Planned Community work
Waters' Edge
Site
Fort Collins, Colorado
Client
Actual Communities
Size
240 Acres
━━━━━━
Waters’ Edge is a 240-acre community under development North of Fort Collins Colorado focused on creating a community that committed to significantly enhancing health for residents 55 & older. Working with Safe & Healthy Communities, municipal & institutional stakeholders and a core team of consultants, Actual Communities is developing a built environment providing access, safety, physical & social opportunities, outdoors, & site grown healthy food. In every way, Waters’ Edge is truly a Water First community dedicated to stewarding on-site water resources.
What we accomplished:
1.
Reduced water & infrastructure costs by 60%, saving the community millions of dollars, through upfront water planning. Simultaneously Hines aided the team in doubling project open space area throughout the community.
2.
Hines engineers have designed a highly efficient non-potable irrigation system with a straightforward management interface & long-term cost effective maintenance protocols. Residents enjoy significant annual water savings & Colorado benefits from significant, successful water conservation efforts.
3.
Water management for the entire community. Residents spend their time outside doing what they love most while Hines scientists manage water use, soil quality, & healthy, vibrant native Colorado landscapes.
Light Farms
Site
Celina, Texas
Client
Republic Property Group & City of Celina
Size
1,070 Acres
━━━━━━
Community building, neighborly events, an on-site CSA program, & a healthy active lifestyle are the hallmarks of the Light Farms development. Following a rigorous national consultant search, Hines Engineers were engaged to develop engineered plans to help mitigate significant water quality issues, develop new sources of non-potable water, & provide engineered Master Planning and non-potable Irrigation System design for the project.
What we accomplished:
1.
By providing a thoughtful Water First irrigation Master Plan, Hines Engineers were able to provide cost clarity to the Developer. This enabled the design team to execute a variety of water based, & landscape architectural decisions which saved the Community hundreds of thousands of dollars.
2.
Hines pre-LEED certified, engineered design documents reduced overall system infrastructure costs by over 40%, eliminated costly & wasteful change orders, & provided upgrades to the existing system which halted uneconomical maintenance practices.
3.
Hines Water Chemists developed an inventive & cost-effective water blending and treatment protocol to mitigate seasonally difficulty water quality & eliminate annual plant replacement costs in the tens of thousands of dollars.
Yellowstone Club
Site
Big Sky, Montana
Client
Varies
Size
Varies
━━━━━━
Yellowstone Club is a 15,200 acre private residential community located in Montana’s Rocky Mountains. Hines Engineers fit right in with the Club’s dedication to region leading water conservation requirements, superior amenities, Montana charm, and overwhelming natural beauty. Providing design & engineering services for over a dozen lots in the Club, the Hines team is equally at home designing high end residential golf, irrigation systems, or water feature mechanical systems.
What we accomplished:
1.
Yellowstone utilizes a regionally appropriate, conservation-minded water allotment for each property. The Hines team is skilled in the requisite water and soil quality, irrigation application, climate requirements, & plant establishment protocols necessary to maximize water availability & build healthy, resilient landscapes in this tough environment.
2.
Need to sustainably support a 9-hole golf course at 9,000 feet elevation? You have come to the right place.
3.
Our do-it-all water engineers have the capability to develop a non-potable water source & irrigation system at the Club. We excel at engineering efficient, water-based infrastructure that disappears in the landscape.
Alys Beach
Client
DPZ CoDesign
Site
Alys Beach, FL
Size
158 acres
Alys Beach is a luxury residential community with an emphasis on sustainability and elegance . Our team aided in the creation of an ingenious irrigation system that utilizes rainwater and filtration to protect the surrounding ecosystem and conserve water.
━━━━━━
What we accomplished:
1.
Hines Engineers assisted in designing a system that draws out iron from wells using sustainable wind powered aeration pumps.
2.
We helped devise a system that naturally filters rainwater into the soil and a manmade lake, which prevents waste and runoff. The rainwater is then distributed for site irrigation.
3.
By reusing water to irrigate native plants, we saved our clients money and conserved water. This is instrumental in protecting the surrounding environment of coastal dunes and beaches.
Evermore
site
Orlando, FL
size
1,100 acres
client
EDSA
This luxury resort in Florida seamlessly integrates eco-friendly technology with opulent amenities. Our expert team played a crucial role in the redevelopment, ensuring sustainability was at the forefront of the design. Nestled amidst the lush landscape, the resort boasts a professionally - designed golf course and a 17 million gallon man made lagoon.
━━━━━━
What we accomplished:
1.
Successfully implemented advanced irrigation technology to water natural plants while preserving eco-friendly practices
2.
Nurtured the resorts greenery and also contributed to environmental conservation efforts
3.
Designed with an emphasis on safeguarding the area from natural disasters and ensuring the landscape's resilience.